Day 1

DAY 1: Traditional Climbing System using the Blake’s Hitch (“Closed system”)

(Download the full pdfTree Worker Program outline for details.)

Throw line use: Entry (5) and canopy (3) throws

Rope placement: Includes placing the rope over a branch, cambium saver installation, and knot tying

Preparing to climb: Includes warm ups, saddle set-up, gear check, clipping in and B.A.C.K. check

Climbing demonstration of double rope end climbing (DREC) and setting pitches

Foot work techniques (4)

Hover over an image to see the caption.

Treeman In Clubhouse

Treeman opens class in the TCI Clubhouse.

Teaching Trees

Yes, you will learn to climb in these trees!

Warm Ups

Warm ups! It's a good idea to loosen your muscles before climbing.

Knot Tying

Learning how to tie the knots for the traditional climbing system.

 

Throwline

Throwline practice in an open field.

Join Our Mailing List