Day 1
DAY 1: Traditional Climbing System using the Blake’s Hitch (“Closed system”)
(Download the full Tree Worker Program outline for details.)
Throw line use: Entry (5) and canopy (3) throws
Rope placement: Includes placing the rope over a branch, cambium saver installation, and knot tying
Preparing to climb: Includes warm ups, saddle set-up, gear check, clipping in and B.A.C.K. check
Climbing demonstration of double rope end climbing (DREC) and setting pitches
Foot work techniques (4)
Hover over an image to see the caption.